HISTORIC SHIPBUILDING WAREHOUSE RE-IMAGINED

The Project

As part of a complete refurbishment Yeoman (SW) Ltd designed and installed a central heating and hot water system for this historic warehouse. Consisting of three central heating zones plus underfloor heating and hot water secondary circulation carefully designed to ensure hot water demand was met at each outlet within 2 seconds. This project also included 2 bathrooms.

Speak to us

We are experts in our trade and take pride in our work – We would be more than happy to hear from you, whether it’s to discuss a proposed project or book a service appointment. Please get in touch.

Contact us