This client wanted a new boiler as the existing combination boiler had become problematic.

A Glow-Worm Energy 25C was specified for this installation, which when combined with the Glow-Worm ClimaPro II load compensating, programmable room thermostat made it fully complaint with Boiler Plus legislation.

As with all our installations, the heating system received a full flush using our Throroughflush cleaning system, and an ADEY Magna Clean Pro II filter was installed for ongoing boiler protection.

With the new boiler and the upgraded 10 year warranty, we can ensure long-term peace of mind for this client.