Conway Road

For this installation, Yeoman (SW) Ltd removed an inefficient cast-iron back boiler and fire front, and a hot water cylinder from the adjacent airing cupboard. We upgraded the system with a Valliant EcoTEC Plus 832 combination boiler, installed in a downstairs cloakroom.

This installation also included Vaillant’s VRT350F load compensating, Boiler Plus compliant programmable room thermostat.

The heating system was flushed using our Thoroughflush fresh water cleaning system, and the Vaillant Protection pack comprising of the Spirotech MB3 filter was installed. This filter automatically upgrades the standard 7 year warranty to a 10 year parts and labour warranty, ensuring our client has long-term peace of mind and confidence in their new boiler.

Speak to us

We are experts in our trade and take pride in our work – We would be more than happy to hear from you, whether it’s to discuss a proposed project or book a service appointment. Please get in touch.

Contact us