For this project, Yeoman (SW) Ltd were invited to design and install a new heating system for this ground floor apartment.
First the existing heating system was to be removed, also the original boiler from when the building was built was still in situ hidden within the kitchen units.
The pipework for the new heating is surface mounted as the floor construction is solid, but has been installed as discreetly as possible, taking into consideration planned furniture locations and built in wardrobes to be constructed later.
The new boiler is a Glow-worm Energy 30C combination boiler, this boiler is a cupboard fit model and will be concealed within the kitchen units. The decorative radiators have been sized and chosen to compliment the future decor, and again positioned to be discreet.
This heating system also boasts the latest Glow Worm MiSet controls, with their touch screen display and sleek look, these will also compliment the fresh new appearance of the apartment.